Gold Fields Ghana hands over 2.26km road to ease Tarkwa traffic – The Gold Fields Ghana Foundation has handed over a completed 2.26-kilometre, double-sealed bitumen road valued at GH¢15.4 million, linking Budo City in New Atuabo to Bogoso Junction in the Tarkwa-Nsuaem Municipality of the Western Region.
The road is expected to provide an alternative route to the congested Tarkwa highway, improve road safety and reduce commuting time for residents and motorists.
Speaking to Channel One News at the commissioning ceremony, Executive Secretary of the Gold Fields Ghana Foundation, Abdel Razak Yakubu, said the project was completed 18 months after construction began and forms part of the Foundation’s corporate social responsibility initiatives in its host communities.
“Eighteen months ago, I stood right at this spot together with other executives of Gold Fields and the Chief of New Atuabo, and we cut the sod for the construction of this road. This is a double-sealed bitumen-surfaced road connecting Budo City in New Atuabo to Bogoso Junction. It is going to serve as an alternative to the main Tarkwa highway, which is usually congested with a lot of traffic. We are happy that 18 months after the sod-cutting, we are here today to hand it over,” he said.
Mr. Yakubu said the project cost slightly over GH¢15 million and covered 2.26 kilometres, adding that the Foundation incorporated drainage infrastructure and road safety features to ensure the road meets standards comparable to those on the company’s mine.
“It is not just about the surface. You can also see the drains. We constructed several metres of drains to improve drainage in the area. We also installed speed humps and road signage to ensure safety. We did it to the standards we have on our own mine, where a stop sign means stop, not slow down or do anything else. Where we have roundabouts, we have caution signs and mandatory signs, all to ensure that the safety culture we have on the mine is also passed on to the people in the community,” he added.
The Manager of Gold Fields Tarkwa Mine, Catherine Kupal, said the road was designed to improve mobility, road safety and economic activities in the beneficiary communities.
She said a preliminary survey conducted by the Foundation among residents and motorists revealed the deplorable state of the road before construction, with more than 92 per cent of respondents rating it as poor or very poor.
“Not long ago, this Budo City road was one that many motorists simply avoided. Before we began construction, the Foundation asked the people who used the road some critical questions. From the survey, 142 residents and 104 motorists participated, and more than 92 per cent rated the road as poor or very poor. Two in every three motorists told us their vehicles broke down frequently. Almost all of them, 97 per cent, said the road condition added between 30 minutes and one hour to their journeys. Nearly six in ten residents said commercial drivers refused to enter the community, and the same number reported delays or difficulties accessing healthcare because of the road,” she said.
Ms. Kupal said the Foundation invested approximately GH¢15.4 million in the project, which features prime coating, double bitumen surface dressing and concrete paving in selected sections.
She said the project also included approximately 4,215 metres of concrete U-drains and 255 metres of double-reinforced concrete storm drains, alongside 59 road signs and nine speed humps.
According to her, the project was executed by local contractor Woodbine Ventures under the technical supervision of the Gold Fields Ghana Foundation and the Tarkwa Municipal Assembly. The project was planned as a two-year intervention but was completed in a year and six months. Let us be clear: quality was not compromised. The work moved at this pace because the demand for an alternative route in Tarkwa grows every day,” she said.
She added that the project provided employment for 33 people from the local communities, including artisans, machine operators and labourers, while also creating business opportunities for local suppliers.
Ms. Kupal said the road would significantly reduce travel time along the corridor, improve access to schools, markets and healthcare facilities, and encourage commercial drivers to return to the communities.
“A journey that took 30 minutes to one hour in heavy traffic is expected to take about 10 minutes. We expect commercial drivers to return to this community, lower repair bills for vehicle owners and easier journeys to school, the market and the hospital, especially in emergencies,” she said.
She further disclosed that the Gold Fields Ghana Foundation had invested more than $76.8 million in infrastructure development in its host communities, including water supply systems, sports facilities and road projects.
The Western Regional Minister, Joseph Nelson, commended Gold Fields Ghana Limited and its Foundation for the project, describing it as an example of how private-sector partnerships can contribute meaningfully to local development.
He urged companies operating in the region to prioritise transformative and sustainable corporate social responsibility interventions rather than isolated charitable activities.
“The Budo City-Bogoso Junction project is a practical example of this approach. By providing an alternative route to the main New Atuabo Junction-Bogoso Junction corridor, the road will help ease traffic congestion, particularly during peak periods, improve connectivity between the two junctions and reduce travel time,” he said.
Mr. Nelson said improved road connectivity could stimulate economic opportunities, facilitate the movement of goods and services, improve access to essential services and enhance the quality of life in beneficiary communities.
He also urged residents and local authorities to take responsibility for the maintenance of the road and its drainage systems to ensure its long-term sustainability.
“I urge the community to regard this road as a collective asset. Let us protect it from avoidable damage, discourage activities that could compromise its integrity and promote responsible use by motorists and other road users. The sustainability of this project will depend not only on the quality of its construction but also on our collective commitment to preserving it for present and future generations,” he added.
Chief Executive of the Ghana Chamber of Mines, Ing. Ken Ashigbey, also commended Gold Fields for its contributions to the Ghanaian economy, citing job creation, the growth of local businesses and infrastructure development.
He called on Ghanaians to support the renewal of Gold Fields Ghana’s mining lease, expected in April 2027, saying the decision should take into consideration the company’s operational performance and its contributions to communities and the national economy.
The Chief of New Atuabo, Nana Kweku Baah, and some residents also expressed appreciation to the Gold Fields Ghana Foundation for the road project.
Tarkwa, a major mining hub in Ghana, has experienced increasing population growth and vehicular traffic over the years, resulting in persistent congestion along its principal road network.
The construction of the Budo City-New Atuabo to Bogoso Junction road is expected to provide motorists with an alternative corridor and ease pressure on the main highway, improving mobility and connectivity across the Tarkwa-Nsuaem Municipality.
2028 polls: ‘Bring your guarantor Ofori-Atta’ – Ahmed Ibrahim jabs Bawumia

